伸缩门调试
添加时间:2022/5/30 15:54:42     浏览次数:
伸缩门调试
Telescopic door commissioning
首先用手动的方式人工推拉门体,检查门体运行是否正常,在确定门体运行正常的情况下,接通电源,控制盒电源指示灯亮,按“开”按钮,“开”指示灯亮,门体能自动打开至设定的限位处自动停止。按“关”按钮 ,“关”指示灯亮,门体能自动关闭至设定的限位处自动停止。在调试运行过程如发现门体运行限位不准确,可调整限位开关的高度。调试运行5次以上,如一切正常方可投入使用。
First, manually push and pull the door body manually to check whether the door body operates normally. When it is determined that the door body operates normally, turn on the power supply, the power indicator of the control box lights up, press the "open" button, the "open" indicator lights up, and the door body automatically opens to the set limit and stops automatically. Press the "off" button, the "off" indicator light will be on, and the door will automatically close to the set limit and stop automatically. In case of inaccurate door operation limit during commissioning, the height of limit switch can be adjusted. After more than 5 times of commissioning and operation, it can be put into use only if everything is normal.
上一页  电动门伸缩门的作用  
下一页  电动伸缩门的保养方法
  • 关于我们
  • 产品展示
  • 新闻动态
  • 网上订单
  • 联系我们
  • 通道闸
  • 岗亭
  • 别墅门
  • 电动平移门
  • 广告栏
  • 悬浮门
  • 不锈钢旗杆
  • 电动伸缩门

Copyright © 技术支持:遨游网络

  • 一键拨号
  • 网上订单
  • 工程案例
  • 本站导航

搜索

  • 关于我们
  • 产品展示
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 通道闸
  • 岗亭
  • 别墅门
  • 电动平移门
  • 广告栏
  • 悬浮门
  • 不锈钢旗杆
  • 电动伸缩门